Technical Turnaround Services
Petrochemical | Upstream | Midstream | Downstream | LNG | Fractionation | Power | Gas compression | RNG - Renewable Natural Gas Projects
Quality Assurance onsite program support | PSSR readiness support | Construction management | Calibrations | Loop checks | Commissioning |Start-up Support | DCS/SIS testing | PLC project support | DCS migration support
Our turnkey services cover calibrations, loop-checks, commissioning and quality assurance.
We take a step further to ensure that the front end installation is correct prior to commence with loop-checks and commissioning.
Our Story:
Experts in instrumentation, control calibrations, and QA testing that catch installer mistakes before they turn into costly delays.
In the high-stakes world of petrochemical and gas-oil projects, the final stage is the most critical. You have spent months building a massive facility. Thousands of field instruments, control valves, and electrical signals are in place. But before you turn the system on, a massive question remains: Is it actually going to work, or is an undiscovered wiring mistake about to trigger an expensive emergency?
We act as your dedicated client representative to give you absolute certainty. We don't just hope the installation was done right; we prove it. By handling the final stage of inspections, calibrations, and complete function testing, we eliminate quality issues upfront and before the very important step "PSSR readiness". We protect your multi-million dollar assets so your facility starts up safely, on time, and on budget.
When installers finish putting together complex instrumentation and control systems, minor errors often slip through the cracks. A single crossed signal or uncalibrated control valve can delay your entire startup, fail third-party audits, can cause catastrophic equipment damage.
Our Solution:
We stand in as your independent eyes and ears on the ground. As your QA Client Representative, we manage the critical final stage of your project lifecycle through three core pillars:
-
Precision Calibration: We calibrate field instruments and control valves to ensure absolute accuracy.
-
Total Function Testing: We test the installers' work completely, checking every signal line and loop.
-
Audit Readiness: We eliminate quality issues early, ensuring the field installations pass by following strict standards.
The Result:
Complete asset protection, zero startup surprises, and total peace of mind.
.jpg)
_edited.png)









